Development of cost engineering in Gazprom Neft JSC

Authors: M.M. Khasanov, D.A. Sugaipov, O.S. Ushmaev, R.R. Bakhitov, R.R. Ismagilov, S.M. Kurkov (Gazprom Neft JSC, RF, Saint-Petersburg)

Key words: cost engineering, cost estimation, cost control, cost data.

The paper describes results of the development of cost engineering in Gazprom Neft. Analysis of the global experience reveals best practices of cost engineering in areas of cost estimation, cost control and cost data management. Approbation of the best practices in Gazprom Neft key assets has shown significant potential for further developing cost engineering in Gazprom Neft. As a result a road map of development of cost engineering was formed. It includes organizational change, improving cost estimating, cost control procedures and creating of cost data management.

References
1. Rawanpura J., Jergeas G., Why cost and schedule overruns on mega oil
sands projects?, Cost Engineering, 2010, V. 52, no. 1, pp. 24-27.
2. Khasanov M., Ushmaev O., Nekhaev S., Karamutdinova D., The optimal parameters for oil field development, SPE 162089, 2012.
3. Khasanov M., Bakhitov R., Sitnikov A., Ushmaev O., Dmitruk D., Nekhaev S.,
Optimization of production capacity for oil field in the Russian Arctic, SPE 166905. – 2013. 


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

10.06.2025
02.06.2025
30.05.2025
30.05.2025
29.05.2025