The input production quality control at the central warehouse of industrial maintenance on rental and repair of electroloading facilities

Authors: E.I. Bordunova, T.G. Dovbenko (Surgutneftegaz OAO)
E-mail: Bordunova_E@surgutneftegas.ru, Dovbenko_TG@surgutneftegas.ru
Key words: input control, technical control service, the central production
laboratory.
The procedure of organization of the input control of repair parts and materials supplied to the central warehouse of industrial maintenance on rental and repair of electroloading facilities is described. The information about sample sizes, types of tests and applied laboratory equipment is given.




Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

10.06.2025
02.06.2025
30.05.2025
30.05.2025
29.05.2025