Wells-logging operation execution using coiled tubing units

Authors: I.I. Levkulich, A.P. Mogilniy (Integra-Services LLC, RF, Moscow), E.N. Shtakhov, Yu.N. Shtakhov, A.A. Boyarkin (Research and Development Enterprise RosTEKtekhnologies OOO, RF, Krasnodar)

Key words: horizontal well, flexible oil-well tubing, geophysical combo connector.

The experience of down-hole tool layouts at wells-logging measurements using coiled tubing units is considered. Basic requirements for flexible oil-well tubing connectors are given.



Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

10.06.2025
02.06.2025
30.05.2025
30.05.2025
29.05.2025