New technologies to isolate lost circulation zones during well intervention

Authors: R.R. Kadyrov, A.S. Zhireev, A.K. Sakhapova, D.K. Khasanova (TatNIPIneft), R.V. Kryuchkov (NIIneftepromkhim JSC)
Lost circulation control is the most expensive type of well work. A suitable cement slurry formulation ensures optimum isolation of lost-circulation zones. Thus clay-silicate slurry is used for squeeze jobs to restore production casing integrity and isolate formations with specific injectivity of 3 m3/(h.MPa), while gypsum silicate slurry is best suited for squeeze jobs during well re-completion operations and repair of damaged casing due to catastrophic mud losses.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

10.06.2025
02.06.2025
30.05.2025
30.05.2025
29.05.2025