Isolation of leaky sites of the flow string and productive stratum by installation of the packer 4 PMS

Authors: A.R. Sarvarov, A.V. Loktev, I.D. Bolgov, M.V. Murzyakov (TNK-Nizhnevartovsk OAO)
The scheme of installation of the packer 4 PMS with the inserted pump in the well of TNK-Nizhnevartovsk OAO is given. The diagrams of operation of wells, equipped with borehole sucker rod pumps, is considered. The advantages and disadvantages of operation of wells with borehole sucker rod pumps and packer are marked.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

29.08.2025
19.08.2025
19.08.2025
31.07.2025
23.07.2025