Analysis of the reliability of hoisting units at well-workover operation

Authors: S.A. Savin, M.M. Ivankiv, S.G. Schergin (Surgutneftegaz OAO), A.S. Kuznetsov (Tyumen State Oil and Gas University)
The causes of well-workover crews downtimes are given, and also the causes of failures of hoisting units, used at wellworkover carrying out, are analyzed. The obtained data can be used for updating the standards of operational capability of hoisting units, as well as for the formation of reusable components and mechanisms for their repair.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Юбилей Великой Победы

Pobeda80_logo_main.png В юбилейном 2025 году подготовлены: 
   - специальная подборка  статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны;  
   - списки авторов публикаций журнала - участников боев и участников трудового фронта

Press Releases

10.06.2025
02.06.2025
30.05.2025
30.05.2025
29.05.2025