Usage experience of special casing pipes equipped with glass-reinforced plastic liners for estimation of oil saturation dynamics and development control
Authors: R.Z. Imamov (Bashneft ANK OAO), N.M. Tokareva ( Ufa State Petroleum Technological University)
On the territory of Arlanskoe oil deposit 18 wells with special casing pipes equipped with glass-reinforced plastic liners and one well with glass-reinforced plastic casing pipe of discontinuous conductivity (USPTU engineering developed) have been organized. Results of geophysical exploration in these wells, are shown. For every single well analysis of oil saturation dynamics of producing interval is made. Recommendations for development control are made.
Attention! To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access
only the authorized visitors of the website can. .