Influence of a kind of carried out works on pulling units reliability

Authors: S.A. Savin, S.A. Kuznetsov, S.G. Shchergin (Surgutneftegaz OAO)
It is shown, that the acting loads value in pulley-block system of pulling units is influenced with kinds of carried out wellworkover operations. The concept of works complexity factor, which characterizes relative number of the executed well-workover operations, is entered. Failure intervals of components and elements of pulling unit A 50 depending on wells repair complexity factor are analysed. It is shown, that with increase in number of carried out complex repairs the failure interval of the basic components decreases, that is interpreted by increment of loads, acting in components and mechanisms of units. The mathematical model of this dependence is obtained.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

СКОРБИМ

16-12-25_aristakisyan_foto.png 16.12.2025 г. ушел из жизни, известный российский инженер-геофизик, Заслуженный работник нефтяной и газовой промышленности РФ, Почетный нефтяник, большой друг нашего журнала
Ленарг Георгиевич Аристакесян.

Press Releases

11.12.2025
08.11.2025
17.10.2025
25.09.2025
23.09.2025