The article presents the results of experimental field operations on the use of eccentric calibrators with a diameter of 118, 126 and 152,4 mm as part of a section of steel drill pipes when completing horizontal sections of new and reconstructed wells at the fields of Orenburgneft JSC. These operations were carried out as part of the strategic task of Rosneft Oil Company to increase the commercial rate of drilling production wells. It is shown that the expert work of Rosneft's specialists made it possible to solve a complex production task of improving the preparation of horizontal sections of wellbores during completion by the method of lowering tailings with multi-stage hydraulic fracturing (MSHF). This technical and technological solution significantly reduced the time spent by Orenburgneft JSC on long-term studies of horizontal sections of new and reconstructed wells before lowering tailings with MSHF. Using a software package for engineering calculations in drilling, the authors performed modeling of technological operations for well completion with eccentric calibrators as part of a steel drill pipe assembly, which enabled them to determine the calibration friction coefficients in the casing and open wellbore. The article presents economic indicators of reducing production time for preparing horizontal wellbores at the fields of Orenburgneft JSC, and analyzes the possible risks of using this technology for subsequent replication of the obtained experience in completion of horizontal sections with similar geological conditions using shanks with MSHF.
References
1. Gerzhberg Yu.M., Technology of drilling a wellbore for running rigid casing strings using eccentric devices (In Russ.), Inzhener-neftyanik, 2009, no. 4, pp. 13–17.
2. Salakhov M.F., Davletov R.I., Aleksashev A.P., Zinatullina E.R., Optimizatsiya srokov stroitel’stva skvazhin za schet primeneniya ekstsentrichnykh kalibratorov (Optimization of well construction times through the use of eccentric calibrators), Collected papers “Inzhiniring stroitel’stva i rekonstruktsii skvazhin” (Well construction and reconstruction engineering), Proceedings of scientific and technical conference, Samara: Publ. of SamaraNIPIneft LLC, 2022, pp. 64–64.
3. Sundeev S.Yu., Primenenie ekstsentrichnogo kalibratora-rasshiritelya pri stroitel’stve gorizontal’nykh skvazhin (Application of eccentric calibrator-expander in horizontal well construction), Collected papers “Kompleksnyy inzhiniring v neftegazodobyche: opyt, innovatsii, razvitie AO “Giprovostokneft’” (Integrated Engineering in oil and gas production: Experience, innovation, and development at Giprovostokneft), Proceedings of 6th international scientific and practical conference, Samara, 2024.
Юбилей Великой Победы
В юбилейном 2025 году подготовлены: - специальная подборка статей журнала, посвященных подвигу нефтяников в годы Великой Отечественной войны; - списки авторов публикаций журнала - участников боев и участников трудового фронта. |