Field experience of using the inflow profile monitoring system in the cemented completion

UDK: 622.276.2.001.57
DOI: 10.24887/0028-2448-2026-6-82-85
Key words: ecological risks, tracers monitoring, horizontal wells, inflow profile monitoring, cemented completion, multistage fracturing, water breakthrough, fracturing quality
Authors: A.V. Fadeev (Neftisa Oil Company, RF, Moscow); P.A. Zhikharev (Belkamneft JSC, RF, Izhevsk); Е.S. Isupov (Belkamneft JSC, RF, Izhevsk); M.D. Kuramshin (Belkamneft JSC, RF, Izhevsk); О.N. Zhuravlev (WORMHOLES Technologies LLC, RF, Moscow); А.V. Gribanov (WORMHOLES Technologies LLC, RF, Moscow)

The paper under consideration presents the field experience of using the tracer’s inflow profile monitoring system in the cemented completion for the reduction of environmental risks. Nowadays there are no examples of the use of tracer’s inflow profile monitoring systems for cemented completion in world practice. Existing technologies are unable to perform high-quality measurements in these conditions, or there is no such opportunity as a result of the technological limitations. Oil producing companies are forced to bear significant financial costs and increased operational risks when operating the horizontal wells using conventional methods of production logging with the delivery of complex measuring equipment to the target depth on a geophysical cable or with the use of coil tubing. Oil and gas production companies have to reduce the production logging programs in order to reduce the costs, which excludes the possibility of reaching the maximum potential of the hydrocarbon recovery in the long term. The tracer’s inflow profile monitoring technologies used in the jobs described in this article enable the high-quality monitoring of the well’s operation for a long time without interrupting the production process, at the same time significantly reducing capital and operating costs along with reducing environmental risks during well operation.

References

1. Geofizicheskie issledovaniya skvazhin: spravochnik mastera po promyslovoy geofizike (Well survey: a reference guide for field geophysics): edited by Martynov V.G., Lazutkina N.E., Khokhlova M.S., Moscow: Infrainzheneriya Publ., 2009.

2. Gur’yanov A., Katashov A., Ovchinnikov K. et al., About the technology of marker monitoring of horizontal wells (In Russ.), Neftegazovaya vertikal’, 2020, No. 9–10, pp. 99–103.

3. Proceedings of 6th scientific and practical conference “Gorizontal’nye skvazhiny 2024” (Horizontal wells 2024), Kazan, 13–16 May 2024, Moscow: Geomodel’ Razvitie Publ., 2024, 354 p.

4. Patent RU2702446C1, Method for determination of well fluid influx from separate well intervals, Inventor: Zhuravlev O.N.

5. Zotov E.N., Bayunov S.V., Musaev M.N. et al., Application of marker systems for determining the inflow profile at the Samotlor field (In Russ.), Neftegazovaya vertikal’, 2025, No. 3.



Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .