Experience of using radial drilling technology at the Severo-Khosedauskoe field

UDK: 622.243.2
DOI: 10.24887/0028-2448-2024-4-28-31
Key words: side track, cut-off, drilling, radial drilling, enhanced oil recovery, geological and technical activities, new method
Authors: O.V. Akimov (Zarubezhneft JSC, RF, Moscow), K.V. Kempf (Zarubezhneft JSC, RF, Moscow), D.V. Shkarin (Zarubezhneft JSC, RF, Moscow), A.V. Donskoi (Zarubezhneft JSC, RF, Moscow), A.I. Bashirov (Perfobur Service LLC, RF, Moscow), V.A. Makarenko (Perfobur Service LLC, RF, Moscow), D.L. Kasimov (Perfobur Service LLC, RF, Moscow), A.V. Lyagov (Perfobur Service LLC, RF, Moscow), I.A. Lyagov (Perfobur Service LLC, RF, Moscow)

Currently, enhanced oil recovery methods from the existing well stock are widely used in the oil and gas industry. The production rate of wells decreases in time due to watering, failure of downhole equipment and etc. Regular methods of well workover and enhanced oil recovery do not provide a significant increase in flow rate and its preservation for a long time. Drilling new wells is expensive, while restarting idle wells allows reducing the financial burden on oil and gas producing enterprises. This article is devoted to a new method of enhanced oil recovery – controlled radial penetration of the formation along a given trajectory. This method consists of drilling one, two or more channels up to 14 m long in previously drilled wells. While drilling the intensity of angle gain reaches 8 deg/m. It is possible to drill up to 4 channels from one kickoff point with an unlimited number of such points in well. All work is carried out use a lifting unit for workover with standard tubing, without the using of coiled tubing. Drilled channels can be cased with filters, which ensure their stability. Logging can also be carried out at a distance from the main shaft as well as hydrochloric acid treatment. This type of geological and technical activity can be used for inflow stimulation, initial opening of the formation, for well testing, as an alternative to sidetracking, to bypass failure equipment, to orient cracks during hydraulic fracturing. The article describes the experience of using the technology of radial opening of the formation at the Zapadno-Khosedayuskoe field, which is a part of the group of the Centralno-Khoreyverkoe uplift.

References

1. Gibadullin N.Z., Taygin E.V., Saligaskarov R.R. et al., The experience of horizontal well coiled tubing drilling in ANK Bashneft (In Russ.), Vremya koltyubinga. Vremya GRP = Coiled tubing times Journal, 2004, no. 8, pp. 40–45.

2. Shamov N.A., Lyagov A.V., Panteleev D.V. et al., Equipment and technology creation of ultra-deep perforations (In Russ.), Neftegazovoe delo, 2012, no. 2, pp. 131–174.

3. Fursin K.S., Griguletskiy V.G., A flexodrilling perforation bit for deep sparing exposing productive intervals in the cased well (In Russ.), Karotazhnik, 2015, no. 9, pp. 60–72.

4. Mal’tsev A.A., Lyagov I.A., Lyagov A.V., Development of an innovative radial drilling system to enhance oil recovery (In Russ.), Neft’. Gaz. Nofvatsii, 2016, no. 11, pp. 67-71.

5. Kasimov D.L., Lyagov I.A., Lyagov A.V., Tekhnologicheskie osobennosti frezerovaniya obsadnykh kolonn vysokoy gruppy prochnosti tekhnicheskoy sistemoy Perfobur (Technological characteristics of milling of high-group casing columns with technical Perfobur system), Collected papers “Sovremennye problemy neftegazovogo oborudovaniya” (Modern problems of oil and gas equipment), Ufa: Publ. of USPTU, 2019, pp. 88–95.

6. Utility patent RU 195139 U1, Buril’naya komponovka s malogabaritnym gidravlicheskim zaboynym dvigatelem (Drilling assembly with a small-sized hydraulic downhole motor), Inventors: Lyagov A.V., Lyagov I.A.



Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .