This paper discusses the potential of considering the uncertainty of geologic aspects in interwell space to predict the efficiency of planned horizontal wells drilling through geologic modeling using various deterministic and stochastic parameter distribution algorithms.
References
1. Khisamov R.S., Nasybullin A.V., Modelirovanie razrabotki neftyanykh mestorozhdeniy (Simulation of oil fields development), Moscow: Publ. of VNIIOENG, 2008, 255 p.
2. Nasybullin A.V., Antonov O.G., Shutov A.A., Neftyanoe khozyaystvo – Oil Industry, 2012, no. 7, pp. 14-16.
3. Sultanov A.S. et al., Neftepromyslovoe delo, 2011, no. 5, pp. 13-17.
4. Sultanov A.S., Nasybullin A.V., Sattarov R.Z., Neftyanoe khozyaystvo – Oil Industry, 2008, no. 7, pp. 54-57.