Логин:
Пароль:
Регистрация
Забыли свой пароль?

Chemical-analytical procedure to determine water cut of well production from separate layers in dual completions

Authors: K.M. Garifov, P.N. Kubarev, A.Kh. Kadyrov, A.V. Glukhoded, V.A. Balboshin, I.N. Rakhmanov (TatNIPIneft)
The paper describes method based on measurement of ions concentration to estimate water cut of well production from different producing intervals when using single-tubing-string dual completion systems.
The paper describes method based on measurement of ions concentration to estimate water cut of well production from different producing intervals when using single-tubing-string dual completion systems.


Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

29.06.2020
11.06.2020
02.06.2020