Логин:
Пароль:
Регистрация
Забыли свой пароль?

Isolation of leaky sites of the flow string and productive stratum by installation of the packer 4 PMS

Authors: A.R. Sarvarov, A.V. Loktev, I.D. Bolgov, M.V. Murzyakov (TNK-Nizhnevartovsk OAO)
The scheme of installation of the packer 4 PMS with the inserted pump in the well of TNK-Nizhnevartovsk OAO is given. The diagrams of operation of wells, equipped with borehole sucker rod pumps, is considered. The advantages and disadvantages of operation of wells with borehole sucker rod pumps and packer are marked.
The scheme of installation of the packer 4 PMS with the inserted pump in the well of TNK-Nizhnevartovsk OAO is given. The diagrams of operation of wells, equipped with borehole sucker rod pumps, is considered. The advantages and disadvantages of operation of wells with borehole sucker rod pumps and packer are marked.


Attention!
To buy the complete text of article (a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .

Mobile applications

Read our magazine on mobile devices

Загрузить в Google play

Press Releases

13.11.2019
08.11.2019
30.10.2019