New Technologies in LUKOIL: from Simple to Complicated

UDK: 622.276
DOI: 10.24887/0028-2448-2019-8-62-66
Key words: technologies, pilot operations, multilateral wells, hydraulic fracturing, slim wells
Authors: V.L. Voevodkin (LUKOIL-Engineering LLC, RF, Moscow), M.V. Chertenkov (LUKOIL-Engineering LLC, RF, Moscow)

The article highlights the activities of LUKOIL PJSC in the area of research, adaptation and testing of new technologies as part of the implementation of the Pilot Operation Program in the Company. Statistical data on the pilot operation performance and on the transition of the technologies to the commercial operation stage is provided. The history of enhancing the hydraulic fracturing technologies, construction of multibranch wells (multilateral and multihole ones), drilling of slim wells is highlighted as examples of development of the innovative directions on the “from simple to complicated” basis. As part of development of the hydraulic fracturing area, information is provided regarding the evolution of applicable hydraulic fracturing technologies from formation injection operations (up to 10 t of propping agent) to large-scale hydraulic fracturing (100 t and more) and, further, to multistage hydraulic fracturing technologies for horizontal wells. The data on the efficiency of multistage hydraulic fracturing at LUKOIL PJSC fields is provided. The development of multilateral well construction technologies in the Company is represented from the drilling of first multilateral wells with double completion and further to the construction of multihole wells with TAML-5 complexity degree at the offshore fields. Drilling of slim wells obtained its development and distribution across LUKOIL PJSC primarily due to its economic viability for the conditions of the mature fields operating at the advanced development stages. Starting from year 2010, the slim well drilling technologies have evolved from pilot operations to the level of engineering solutions for field development project design documentation. Besides, in 2017, a first multilateral slim well was successfully drilled at the Osinsky field, and a sidetracking technology for slim wells was developed.

References

1. Mulyak V.V., Chertenkov M.V., Shamsuarov A.A. et al., Increasing efficiency of hard-to-recover reserves involving in the development with use of multi-zone hydraulic fracturings in horizontal wells (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2011, no. 11, pp. 48–51.

2. Voevodkin V.L., Aleroev A.A., Baldina T.R. et al., The evolution of the hydraulic fracturing technology on the fields of Perm region (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2018, no. 11, pp. 108–113.

3. Voevodkin V.L., Lyadova N.A., Okromelidze G.V. et al., Experience and prospects of slim hole construction on LUKOIL-PERM oilfields (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2018, no. 12, pp. 98–102.



Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .