The development of the standard designs system in Rosneft Oil Company

UDK: 622.276.012
Key words: : unification, typical, economic effect, engineering, oil and gas development
Authors: A.A. Kaverin, A.M. Korkin, S.E. Motus (Rosneft Oil Company PJSC, RF, Moscow), A.F. Agafontsev, A.A. Nizametdinov (RN-SakhalinNIPImorneft LLC, RF, Yuzhno-Sakhalinsk)
The Standard Designs System being created at the Rosneft Oil Company PJSC is aimed to the decision of inter-related tasks package on optimization of the expenses when designing, construction and maintenance the objects of oil and gas fields development. On the basis of the methodological procedures being the regulatory documents of the Russian Federation in the sphere of design and construction, the Company experience accumulated while realization of projects in the different regions, there had been established the basic types of the documentation, which shall be subjected to unification and type assignment. The work conducted will permit to provide by 2017 the settlement of the standard design documentation for approximately 35% of the design objects. The integrated assessment of economic impact thru the Standard Designs System, and also the drawing up of the solutions for point correction of the existing System is possible by means of the information lifetime being created for application monitoring of the standard design documentation and acquisition of statistical data. The methodological procedures built-in to the Standard Designs System of the Company make possible to realize the extrapolation of beneficial effects for type designs of the construction objects in oil refining, petrochemistry, the development of gas and gas-condensate fields, as well as the offshore fields, including the Arctic.
References
1. Liron E., The goal – quality of design products (In Russ.), Neftyanoy kur'er,
2015–2016, V. 104/105, p. 4.
2. Kaverin A.A., Korkin A.M, Belyaev P.V., Assessment of effects from implementation
of unified design solutions in Rosneft Oil Company OJSC (In Russ.),
Neftyanoe khozyaystvo = Oil Industry, 2015, no. 11, pp. 60–63.
3. Kudryashov S.I., Belkina E.Yu., Ismagilov A.F., Lipatov I.A., Butsaev I.V.,
Abramova N.S., Cost monitoring in oilfield construction at different stages of
the investment cycle (In Russ.), Neftyanoe khozyaystvo = Oil Industry, 2015,
no. 11, pp. 72–75.
4. Sushko Yu.V., Kaverin A.A., Korkin A.M., Agafontsev A.F, Shafikov I.S., Unified
design solutions in Rosneft Oil Company (In Russ.), Neftyanoe khozyaystvo =
Oil Industry, 2013, no. 11, pp. 61–63.
5. Hart J., Phaf N., Vermeltfoort K., Saving time and money on major projects,
URL: http://www.mckinsey.com/Insights/Energy_Resources_Materials/Saving_
time_and_money_on_major_projects.


Attention!
To buy the complete text of article (Russian version a format - PDF) or to read the material which is in open access only the authorized visitors of the website can. .